Steel House Frames - Akora’s Triple Guarantee

Akora’s Triple Guarantee.

Rest easy in the comfort of your new Akora home with a 50-year structural warranty* from BlueScope, guaranteed start date of 17 weeks from deposit, and guaranteed delivery date. *T&Cs apply.

Three times the peace of mind.

No-one likes uncertainty. That’s why we offer an industry leading set of warranties and guarantees to guarantee your dream home arrives as agreed, and has been built to last. We call it the Akora Triple Guarantee. From your home’s very structure to our construction and delivery capabilities, the Triple Guarantee is our promise to you of a superior outcome.


Structural Guarantee.

In each Akora home you’re guaranteed the inclusion of the most innovative products and building technologies available in Australia – including the Supaloc steel framing system, an essential building block in our ability to deliver affordable, high performance, low energy, sustainable homes.

Australian-made for Australian conditions, precision-engineered Supaloc is the premium brand for steel frame solutions in the construction industry. In fact, we’re so confident of our quality products and superior construction that, in addition to the standard statutory warranties, every Akora home benefits from a 50-year structural warranty* through BlueScope.

Your structural guarantee ensures your home is:

  • 100% termite and borer proof
  • Engineered to be dimensionally accurate – Supaloc steel frames will not warp, sag or shrink
  • Patented to eliminate movement and noise
  • Engineered to withstand floods, fires and storms
  • Manufactured to leave no room for error
  • Safer, stronger and more secure than other framing solutions
  • Subject to a 50-year structural warranty* through BlueScope steel
  • Supaloc is exclusive to Akora Homes and the NEX Group, and comes standard on all home designs


Akora homes not only look great, they also have added quality built in, inside and out. That’s why every Akora home features Weathertex weatherboards and architectural panels as standard, made from 97% hardwood timber and 3% natural wax for water repellence.

Weathertex is the perfect choice for your transportable home, as the cladding is:

  • Extremely durable
  • Low maintenance
  • Made to last
  • Termite and borer-resistant as all sugars and starches are removed
  • Designed to comply with a zero-carbon footprint


These reasons and more make Weathertex’s highly durable material and low maintenance the perfect choice for the Australian climate.

Guaranteed Start Date.

When you choose an Akora home, you’re choosing our commitment to deliver – with construction to commence 17 weeks from deposit.

Once we receive your initial deposit, we provide a start month commitment for when your house will commence construction. Our construction facility offers a controlled environment from which all of our customer’s homes are constructed. 

Since our capacity is capped within our construction facility, our in-depth forecasting ensures we do not overcommit to production, with our customer’s experience and delivery always the focus of our operation.

In order for your home to achieve the committed start date, all we need from you is:
  • A signed contract and full deposit completed
  • Plan drawings and design changes commenced
  • All colour selection appointments complete and selections signed off
  • Finance approval provided (including Authority to Commence Construction)
  • Land settled and Proof of Title


With all the above in place, your Guaranteed Start Date becomes our 'True North', and your home will commence construction within 17 weeks in accordance with the above requirements. 

Guaranteed Delivery Date.

With Akora, your new home will be delivered within 16 weeks^ – guaranteed.

Thanks to our centralised construction facility and state of the art, streamlined fabrication process, we ensure the fastest build time possible, meaning you, your friends and family, or your workers/tenants can start living sooner in an all-new Akora home.

In order for your build to be delivered by a guaranteed delivery date, we’ll require:
  • Access to the land (prior to delivery to prepare the site)
  • Confirmation of home location and orientation
  • Clear access to your site (i.e. vegetation, trees, power lines, etc.) for road delivery


Akora’s promise is inspired living, home delivered. As one of Australia’s leading transportable home builders, we invite you to visit us today to see and feel the Akora difference. Talk to our experienced Sales team on 1800 219 278 for more information.

Terms & Conditions.

*Structural Guarantee:

Warranty currently offered for residential applications only and is subject to application and eligibility criteria. 

For full terms and conditions and to determine the eligibility of your building for a warranty, visit warranties.bluescopesteel.com.au or call BlueScope on 1800 800 789.

#Guaranteed Start Date:

  • Delays outside Akora’s control may delay the site start date. These include but are not limited to; development approval, town planning, easement delays and retaining wall approvals
  • The Guaranteed Site Start date may be delayed by the industry shut down period (includes but not limited to 4-week period over Christmas) Excludes custom design homes
  • The start date is not a specific date in 17 weeks – we provide a start month 17 weeks ahead and your job will be scheduled to start sometime in that month provided
  • The guaranteed start date is applicable to only one single home per quote (unless noted otherwise)
  • Any reference to days is specific to business days, not calendar days


^Guaranteed Delivery Date:

  • Akora reserves the right to change the Guaranteed Delivery Date due to reasons including, but not limited to; inclement weather, variations raised during construction period, delays due to owner works in our facility, restrictions limiting freedom of travel and supplier delays.
  • The Guaranteed Delivery Date may be delayed by the industry shut down period (includes but not limited to 4-week period over Christmas)
  • Delays caused due to client requests such as holding for stage inspections in our facility will void the build time guarantee
  • Date is void where hidden site conditions are encountered including but not limited to; rock, buried material, artifacts, sewer or other underground services.
  • Any breach of contract will lead to an extension of time, or the owners failure to make any payment on time
  • The delivery means the home has arrived onsite – site works for the purpose of home installation and post-delivery building works are excluded from this guarantee. The time starts when the home is started in our facility
  • Any reference to days, is specific to business days, not calendar days


**Guaranteed timeframes, including start date and delivery date is based on the above conditions and customer contributions being delivered to meet key milestones. Refer to items listed above, for #Guaranteed Start Date and ^Guaranteed Delivery Date for full details.